Customer guide to order

  • Choose Your Charger
  • Select Installation Option *Free or Paid *(ensure you read and confirm eligibility)
  • Choose a Preferred Date & Time for Your Installation
  • Add to Cart & Check out
  • The evBug team will be in contact to confirm details and gather evidence for the OZEV grant claim (where applicable)
  • We will carry out the grant claim on your behalf and automatically deduct this from the total you pay.

Domestic Install Costings


Standard Installation £395

  • Up to 10 metres of cabling run externally
  • Connection at your consumer unit or meter position
  • Fitting of Surge Protection Device if requested inline with BS7671 443.4.1
  • Fitting of current limiting clamp and wiring upto 10 metres between charge point and meter, additional accessories to charge point required in some cases
  • Fitting of cable holders/cradles if applicable
  • Connection and commissioning via local WiFi network
  • Test & Inspection of the installation including electronic test & building control certificate

We will fully install and commission your single phase charger upto 7.4Kw to include the running of a cable fixed on the outside of your property upto 10 metres at a maximum height of 2.8 metres, the fitting of a separate consumer unit within your property or in an external weatherproof enclosure adjacent to your electricity meter box , the fitting and connection of your charge point to a wall and accessories where applicable,the fitting of an functional isolation switch, *the fitting of a surge protective device if required (their is an additional charge for this),connection and set up of current transformer clamp to monitor Installation loading, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point,claim of the grant on your behalf if applicable, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted (there is an additional charge for this if not in place), the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, steady WiFi signal is required at the charge point location to -68dBm or superior, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management. Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.

* please see our handy guide for Surge Protection Devices on the footer of our website.